Execution of MEP works for key university facilities including hotels, stadiums, commercial and recreation buildings, central kitchen facilities, and residential villas. The project required high-quality coordination and commissioning of building services.
CONTRACT VALUE
Confidential
BUILD UP AREA / CAPACITY
109 Villas + Facilities
LOCATION
Jeddah, KSA
Scope of Work
Storm drainage network: 4.5 Kilometers of GRP pipes up to 2000 mm diameter including cast in situ and precast manholes and catch basins, a pumping station and 4 outfalls.
basins, a pumping station and 4 outfalls. Sanitary Sewer System: 2.5 Kilometers of uPVC pipes up to 300 mm diameter with manholes and inspection chambers and four sanitary lifting stations.
Potable water network: 4.5 Kilometers of HDPE pipes up to 250 mm diameter with valve chambers and fire hydrants.
Irrigation network: 2 Kilometers of HDPE pipes up to 250 mm diameter.
Medium Voltage, Low Voltage and Fiber Optic Duct banks, Special Manholes and Handholes.